Sites change daily. Same camera height, week after week — so the audience watches the skeleton stand up.
Raw
Where it started.
Slab — day one
The site builds
Slab to skeleton.
Walls, trusses, standing — same camera height every pass.
- Slab
- Walls
- Framed
- Trusses
- Standing
✓ Standing
Process
Wide, then tight
Establish the site, then punch into the detail that proves craft — connectors, lifts, lines on slab.

Output
Long and short
Reels for discovery, longer cuts for YouTube — same stages, different length.
Deliverables
What shipped.
- Weekly site coverage
- Vertical + horizontal exports
- YouTube cuts
- Thumbnail stills



